The clientβs architect approached us for a general refurbishment, commenting that her flat on the top floor of a Georgian mansion block was unliveable as it was unbearably hot in the summer and extremely cold during winter.
We stripped the entire property back to bare bones, including all flooring, walling, ceiling and finishes. We opened up the ceilings into the roof void, insulated the entire roof and floor, repainted and draught-stripped the original sash windows and installed new Dinesen Douglas Fir flooring. We fitted a new kitchen and new bathroom with high end Duravit sanitaryware and a glass balustrade.
The most challenging aspect of the job was that the only access to the site was through a very confined staircase 5 stories up without parking or storage space. All materials and waste had to be kept in the common staircase area which required very precise coordination and outstanding housekeeping from our builders.
As part of the works we also upgraded leaking cold water tanks supplying the entire property.
“Rafael was involved from the beginning and contributed useful ideas and suggestions throughout the project.”
“Rafael demonstrated a great knowledge in respect of building work and was able to draw plans and give advice regarding interior design.”
βBow Tie Construction were very professional, they did things to a very high standard and paid a lot of attention to detail. When small issues were flagged here or there they were always keen to investigate and fix them.β
βPrewett Bizley and Bow Tie Construction worked very well in partnership which made our lives very easy.β
“My projects with Bow Tie are the only ones where Iβve left the contractor to follow my airtightness details and the projects have passed the 1st airtightness test.”