Beaconsfield

Low Energy Barn Conversion
Design
Gresford Architects
Contract Value
Circa £450k
Project Description

This project features as an example of a modern yet sensitive barn conversion 21 minutes into the program on ‘Old House New Home’ series 6 episode 3

We were initially approached by Gresford Architects to undertake a sympathetic renovation of a Historic England listed building.

We were initially tasked with a total interior refurbishment including kitchens & bathrooms. During initial discussions with the client and architect we proposed tried and tested energy saving measures that could be implemented during the refurbishment process. These would enhance the year-round comfort of the building. Icynene spray foam insulation was injected into the roof area and into timber frame wall sections. The entire floor of the house was excavated and rebuilt with PIR which was then liquid screeded.

Bow Tie Construction assisted with the re-design of structural steel layouts in the kitchen area to achieve maximum head height and to allow tall windows and doors. We designed and installed the bespoke steel staircase using reclaimed scaffolding boards as steps. The staircase uses extremely slim laser cut profiles.

All new windows were fitted including including new rooflights and Critall products. The large 3m x 2.4m kitchen feature window slides into the existing wall and creates a seamless connection between the kitchen diner and patio terrace.

Bow Tie joiners built the bespoke panelling with an invisible door that was installed in the snug. We also repaired existing feature beams and added new beams.

We undertook a full re-wire and re-plumbing of entire house including adding a water booster, high performance cylinder and two boilers. We fitted an MVHR system for half the house where the main bedrooms and bathrooms are.

  • “Prewett Bizley and Bow Tie Construction worked very well in partnership which made our lives very easy.”

    – Francis M
  • “The house definitely meets expectations and exceeds them in some areas, the heat comfort is very big, the noise is much less than it was, overall very happy with it.”

    – Francis M
  • “Rafael was involved from the beginning and contributed useful ideas and suggestions throughout the project.”

    – Donald & Tania S
  • “Rafael is particularly knowledgeable about green issues and we now have a kitchen/breakfast room which is easy and cheap to heat in the winter and cool in the summer.”

    – Donald & Tania S
  • “Rafael’s product knowledge and technical skills helped us solve many tricky problems and ultimately produce our dream home. Thanks Rafael!”

    – Zahid H

    Interested in working with us?

    Share this article

    2022 © Bow Tie Construction Ltd. All rights reserved. Company registered in England No. 7573334. VAT registration number 113 0702 74.
    Registered office: Unit 86, Basepoint Business Centre, High Wycombe, Buckinghamshire, HP12 3RL   Privacy Policy