Project Description
This is our third project for bere:arachitects, the continuation of fruitful collaboration between one of the UK’s best known award-winning low-energy architecture practises and Bow Tie Construction.
The house is being completely stripped out and its thermal efficiency upgraded to near Passive House standards. New bathrooms and kitchen will be installed and the entire house redecorated. An MVHR system will be installed to ensure clean fresh air 24/7.
“Bow Tie Construction were very professional, they did things to a very high standard and paid a lot of attention to detail. When small issues were flagged here or there they were always keen to investigate and fix them.”
“This house is cosy and comfortable but in a natural way. Our old house was of similar scale, area and build and if you wanted to heat a room you had to blast it and the air would then be very dry and that heat would quickly leak out.”
“Not only was the work done to exactingly high standards but Rafael made many excellent suggestions which resulted in a build which made more sense.”
“Passing our air test the first time is testament to how well Bow Tie do things”
“My projects with Bow Tie are the only ones where I’ve left the contractor to follow my airtightness details and the projects have passed the 1st airtightness test.”
Interested in working with us?

Sutton Energiesprong 6

Notting Hill Mews House Retrofit

Max Fordham House

Potters Bar

Muswell Hill EnerPHit

Kentish Town

Stamford Brook

Kennington EnerPHit

Maida Vale

Tottenham

Angel

Bounds Green

Kensal Green Passive House

Bayswater