Skip to main content

Testimonial Category: Bloomsbury

Toni M

“We’re expecting a dramatic reduction in costs. We now know how much energy we’ve used (in March) and we rarely have the heating on compared to this time last year in our old house.”

Francis M

“Bow Tie was a pleasure to work with. I think we were very lucky to find them. They gave me a very high level of confidence that all technical aspects were within their control and they knew what they were doing. This was a technical project and it was important for us to be comfortable on those matters. At the other end of the scale, they paid just as much attention to all the niggly, small decorative matters that become very important towards the end of the build. They were impressive right across the range of skills you have to have to get a project like this done well.”

Francis M

“The Grade II listing permission required a lot of flexibility in the building, planning and scheduling and real close cooperation between Prewett Bizley and Bow Tie and they managed it very well, putting in contingencies and safety nets in case planned windows were not approved. There was a flexible approach to managing a dynamic project. In the end we did achieve exactly what we wanted with secondary glazing as a result of Prewett Bizley and Bow Tie’s consistent and careful lobbying of Islington planning department until they agreed with what was proposed.”

Francis M

“It quickly became clear that Bow Tie want to do a good job, they want their work to be to a high standard, no problem is too small to discuss and identify solutions, and they really want to get it right.”