Francis M
“The Grade II listing permission required a lot of flexibility in the building, planning and scheduling and real close cooperation between Prewett Bizley and Bow Tie and they managed it very well, putting in contingencies and safety nets in case planned windows were not approved. There was a flexible approach to managing a dynamic project. In the end we did achieve exactly what we wanted with secondary glazing as a result of Prewett Bizley and Bow Tie’s consistent and careful lobbying of Islington planning department until they agreed with what was proposed.”