Hammersmith
Project Description
This is our third project for bere:arachitects, the continuation of fruitful collaboration between one of the UKβs best known award-winning low-energy architecture practises and Bow Tie Construction.
The house is being completely stripped out and its thermal efficiency upgraded to near Passive House standards. New bathrooms and kitchen will be installed and the entire house redecorated. An MVHR system will be installed to ensure clean fresh air 24/7.
“Rafael is very familiar with the latest building technologies and is always on hand to offer suggestions and advice on the practicalities of achieving the desired end product.”
“Not only was the work done to exactingly high standards but Rafael made many excellent suggestions which resulted in a build which made more sense.”
βBow Tie Construction were very professional, they did things to a very high standard and paid a lot of attention to detail. When small issues were flagged here or there they were always keen to investigate and fix them.β
“I have enormous respect for Bow Tie as a contractor: Itβs a real pleasure not having constant battles and headaches from a builder trying to do the bare minimum.”
“Passing our air test the first time is testament to how well Bow Tie do things”
Interested in working with us?

Sutton Energiesprong 6

Notting Hill Mews House Retrofit

Max Fordham House

Potters Bar

Muswell Hill EnerPHit

Kentish Town

Stamford Brook

Kennington EnerPHit

Maida Vale

Tottenham

Angel

Bounds Green

Kensal Green Passive House

Bayswater

Arts and Crafts House