Beaconsfield
Project Description
This project features as an example of a modern yet sensitive barn conversion 21 minutes into the program onΒ βOld House New Homeβ series 6 episode 3

We were initially approached by Gresford Architects to undertake a sympathetic renovation of a Historic England listed building.
We were initially tasked with a total interior refurbishment including kitchens & bathrooms. During initial discussions with the client and architect we proposed tried and tested energy saving measures that could be implemented during the refurbishment process. These would enhance the year-round comfort of the building. Icynene spray foam insulation was injected into the roof area and into timber frame wall sections. The entire floor of the house was excavated and rebuilt with PIR which was then liquid screeded.
Bow Tie Construction assisted with the re-design of structural steel layouts in the kitchen area to achieve maximum head height and to allow tall windows and doors. We designed and installed the bespoke steel staircase using reclaimed scaffolding boards as steps. The staircase uses extremely slim laser cut profiles.
All new windows were fitted including including new rooflights and Critall products. The large 3m x 2.4m kitchen feature window slides into the existing wall and creates a seamless connection between the kitchen diner and patio terrace.
Bow Tie joiners built the bespoke panelling with an invisible door that was installed in the snug. We also repaired existing feature beams and added new beams.
We undertook a full re-wire and re-plumbing of entire house including adding a water booster, high performance cylinder and two boilers. We fitted an MVHR system for half the house where the main bedrooms and bathrooms are.
“My projects with Bow Tie are the only ones where Iβve left the contractor to follow my airtightness details and the projects have passed the 1st airtightness test.”
“Bow Tie are meticulous in how they do things”
βPrewett Bizley and Bow Tie Construction worked very well in partnership which made our lives very easy.β
βBow Tie Construction were very professional, they did things to a very high standard and paid a lot of attention to detail. When small issues were flagged here or there they were always keen to investigate and fix them.β
βIt quickly became clear that Bow Tie want to do a good job, they want their work to be to a high standard, no problem is too small to discuss and identify solutions, they really want to get it right.β
Interested in working with us?

Sutton Energiesprong 6

Notting Hill Mews House Retrofit

Max Fordham House

Potters Bar

Muswell Hill EnerPHit

Kentish Town

Stamford Brook

Kennington EnerPHit

Maida Vale

Tottenham

Angel

Bounds Green

Kensal Green Passive House

Bayswater

Arts and Crafts House
