Skip to main content

Kensington

Design
Backroom Studios LLP
Project Description

The client’s architect approached us for a general refurbishment, commenting that her flat on the top floor of a Georgian mansion block was unliveable as it was unbearably hot in the summer and extremely cold during winter.

We stripped the entire property back to bare bones, including all flooring, walling, ceiling and finishes. We opened up the ceilings into the roof void, insulated the entire roof and floor, repainted and draught-stripped the original sash windows and installed new Dinesen Douglas Fir flooring. We fitted a new kitchen and new bathroom with high end Duravit sanitaryware and a glass balustrade.

The most challenging aspect of the job was that the only access to the site was through a very confined staircase 5 stories up without parking or storage space. All materials and waste had to be kept in the common staircase area which required very precise coordination and outstanding housekeeping from our builders.

As part of the works we also upgraded leaking cold water tanks supplying the entire property.

“I was delighted with Bow Tie Construction and have recommended them to several friends and neighbours.”

– Toni M

“I have enormous respect for Bow Tie as a contractor: It’s a real pleasure not having constant battles and headaches from a builder trying to do the bare minimum.”

– Justin Bere

“We’re really lucky to have Bow Tie Construction working on our project. Thanks for all your fantastic work so far.”

– Nick H

“Not only was the work done to exactingly high standards but Rafael made many excellent suggestions which resulted in a build which made more sense.”

– Raza R

“All the onsite employees were polite and meticulously tidy, doing their very best to fit in around us.”

– Raza R

    Interested in working with us?

    Share this article