Harpenden Passivhaus
Project Description
We are building a replacement dwelling on the site of an old bungalow. The new-build will be an all-electric timber frame 4 bedroom Passivhaus Plus using the ‘homes as power stations’ concept. This means it generates much more electricity than it uses and it can operate ‘off-grid’ without need for grid electricity supply for much of the year, saving any excess in its battery system and further excess sold back to the grid. It affords the occupiers a warm and comfortable environment with constant fresh air. The designers bere:architects also designed our RIBA award-winning project Max Fordham House.
This property is also one of the first installs in the UK of a Pichler PKOM4 fully integrated 2 stage air source heat pump hot water cylinder with MVHR, heating and cooling through air, (air to air), heating through water (underfloor) and hot water as one item. It has been integrated into the Loxone smart home system. The property takes its water from a well and has a huge rainwater harvesting tank which supplies toilets and the washing machine. A 3 stage waste water recycling centre was installed to treat sewage. The resultant ‘grey-water’ is used to irrigate the garden and surrounding fields.
Light and heating sensors in the house communicate with the smart home system which automatically operates the external shutters on windows to regulate internal temperatures. Installing a sprinkler system in a timber frame house also brought complications and required integrated auto water shutoff with four water sensors around the house. If any of the bathrooms or utility room leak water, it auto shuts of water for whole house to prevent damage to the timber frame or insulation.
“I was delighted with Bow Tie Construction and have recommended them to several friends and neighbours.”
“It quickly became clear that Bow Tie want to do a good job, they want their work to be to a high standard, no problem is too small to discuss and identify solutions, they really want to get it right.”
“Bow Tie are meticulous in how they do things”
“My projects with Bow Tie are the only ones where I’ve left the contractor to follow my airtightness details and the projects have passed the 1st airtightness test.”
“We found Rafael polite and enthusiastic, and very quick to grasp what we wanted from the build – he has great communication skills.”
Interested in working with us?
Sutton Energiesprong 6
Notting Hill Mews House Retrofit
Max Fordham House
Potters Bar
Muswell Hill EnerPHit
Kentish Town
Stamford Brook
Kennington EnerPHit
Maida Vale
Tottenham
Angel
Bounds Green
Kensal Green Passive House
Bayswater